重味国产日韩在线观看视频_欧美亚洲欧美日韩中文二区_亚洲欧美动漫综合一区在线_黄色欧美激情视频_亚洲中文第一精品_美女张开腿让男人桶国产_一级欧美一级日韩片中文字幕_福利第四色黄色网站_爱情岛论坛永久免费_亚洲精品无码AⅤ片影音先锋

您好,歡迎訪問濟南慶飛機械設(shè)備有限公司官網(wǎng) 網(wǎng)站

全國咨詢熱線:

15621892888
15550061228

當前位置:首頁>新聞資訊>公司新聞 固定升降貨梯安裝好之后怎么進行調(diào)試?

固定升降貨梯安裝好之后怎么進行調(diào)試?

文章出處:http://hblsnyfwzx.cn/ 人氣: 0 發(fā)表時間:2022-05-23
設(shè)備到貨后我們先要做好安裝前的準備,安裝工程師需先對施工現(xiàn)場進行施工確認,再對施工現(xiàn)場進行水平測試。然后將設(shè)備運到施工現(xiàn)場后,我們施工人員需要清點所有施工工具以及升降貨梯設(shè)備,一切準備就緒后,我們就可以進行施工安裝了。
After the arrival of the equipment, we should first make preparations before installation. The installation engineer should first confirm the construction on the construction site, and then conduct level test on the construction site. Then, after the equipment is transported to the construction site, our construction personnel need to count all construction tools and elevator equipment. After everything is ready, we can carry out construction and installation.
那么當液壓升降貨梯安裝好后我們應該怎樣正確調(diào)試?升降貨梯在安裝移動時要注意,如果升降梯安裝不當會很容易造成設(shè)備故障或事故,接下來下面河南液壓升降貨梯廠家就為大家普及一些升降設(shè)備安裝后正確調(diào)試的知識,希望能夠給大家提供幫助!
So how should we correctly debug the hydraulic elevator after it is installed? Pay attention to the installation and movement of the elevator. If the elevator is not installed properly, it will easily cause equipment failure or accident. Next, Henan hydraulic elevator manufacturer will popularize some knowledge of correct debugging of the elevator after installation, hoping to help you!
1、工作前穿戴好個人勞動保護用品,特別注意戴好防護帽,高空作業(yè)系好防護帶,電工、焊工穿絕緣鞋,并檢查所有使用的工具;
1. Wear personal labor protection articles before work, pay special attention to wearing protective helmets, fasten protective belts for high-altitude operation, electricians and welders wear insulating shoes, and check all tools used;
2、在調(diào)試升降機前一定穿好絕緣鞋、戴好絕緣手套或者站在絕緣墊上,否則禁止施工;
2. Before commissioning the elevator, be sure to wear insulating shoes, gloves or stand on the insulating pad, otherwise construction is prohibited;
3、在安裝時,應先與現(xiàn)場施工單位負責人取得聯(lián)系,共同研究雙方在現(xiàn)場工作中的措施與注意事項,共同遵守執(zhí)行;
3. During installation, contact with the person in charge of the on-site construction unit first, jointly study the measures and precautions of both parties in the on-site work, and jointly abide by and implement them;
4、升降貨梯工作時在每層廳門外,掛有井下有人工作的標牌;
4. When the cargo elevator is working, there is a sign that someone is working underground outside the hall on each floor;
5、在井道工作時,采用36V工作照明燈,在轎廂內(nèi)工作時采用12V工具照明燈;
5. When working in the hoistway, 36V working lamp is used, and 12V tool lamp is used when working in the lift car;
6、工作場所下面不準停人,下腳手架時不準滑下和跳下;
6. No one is allowed to stop under the workplace, and no one is allowed to slide and jump off the scaffold;
7、在調(diào)試中開車人員要配合好調(diào)試人員,精神要集中,聽從調(diào)試人員的指揮;
7. During commissioning, the driving personnel shall cooperate well with the commissioning personnel, concentrate and obey the command of the commissioning personnel;
8、在調(diào)試電梯與井道作業(yè)時,嚴禁酒后操作、打鬧、開玩笑,搞好協(xié)作,監(jiān)護他人工作;
8. During the commissioning of elevator and hoistway operations, it is strictly prohibited to operate after drinking, make trouble and joke, do a good job in cooperation and supervise the work of others;
9、動用氣、電焊時,要遵守氣、電焊操作規(guī)程,注意防火;
9. When using gas and electric welding, observe the operating procedures of gas and electric welding and pay attention to fire prevention;
 

?