重味国产日韩在线观看视频_欧美亚洲欧美日韩中文二区_亚洲欧美动漫综合一区在线_黄色欧美激情视频_亚洲中文第一精品_美女张开腿让男人桶国产_一级欧美一级日韩片中文字幕_福利第四色黄色网站_爱情岛论坛永久免费_亚洲精品无码AⅤ片影音先锋

您好,歡迎訪問濟(jì)南慶飛機(jī)械設(shè)備有限公司官網(wǎng) 網(wǎng)站

全國咨詢熱線:

15621892888
15550061228

當(dāng)前位置:首頁>新聞資訊>公司新聞固定式液壓登車橋安裝坑位要預(yù)留多大?

固定式液壓登車橋安裝坑位要預(yù)留多大?

文章出處:http://hblsnyfwzx.cn/ 人氣: 0 發(fā)表時間:2022-10-10
在現(xiàn)在的倉儲設(shè)備中,固定式液壓登車橋一直發(fā)揮著很大的作用,給人們的裝卸貨提供了非常大的便利性,然后,它需要安裝在固定作業(yè)場合的貨臺上面,比移動式液壓登車橋多了一個安裝的過程,那關(guān)于固定式液壓登車橋安裝坑位要預(yù)留多大?
In the current storage equipment, the fixed hydraulic boarding bridge has always played a very important role, providing great convenience for people to load and unload goods. Then, it needs to be installed on the cargo platform of the fixed operation site, which is one more installation process than the mobile hydraulic boarding bridge. How large is the installation pit reserved for the fixed hydraulic boarding bridge?
固定式液壓登車橋安裝坑位要預(yù)留多大?
How large is the installation pit reserved for fixed hydraulic boarding axle?
由于固定式液壓登車橋有需要定做和不需要定做兩種形式,很多固定場合都是不需要定制的,常規(guī)款登車橋的尺寸是:2440*1830mm,需要預(yù)留的坑位是2600*1860*510mm,只要按照廠家這種標(biāo)準(zhǔn)型尺寸預(yù)留就可以了,然而,有的作業(yè)場合、環(huán)境不同,需要重新根據(jù)現(xiàn)場要求進(jìn)行定制才行,這個時候就需要廠家技術(shù)人員現(xiàn)場勘察,然后設(shè)計登車橋圖紙,才能確定預(yù)留的坑位大小。
As there are two forms of fixed hydraulic boarding bridge: customized and not customized, many fixed occasions do not require customization. The size of the conventional boarding bridge is 2440 * 1830mm, and the pit to be reserved is 2600 * 1860 * 510mm, as long as it is reserved according to the manufacturer's standard size. However, some work occasions and environments are different, and it needs to be customized according to the site requirements, At this time, the manufacturer's technicians need to conduct on-site investigation and then design the boarding bridge drawings to determine the size of the reserved pit.
固定式液壓登車橋
Fixed hydraulic boarding axle
固定式液壓登車橋簡單的安裝過程!
Simple installation process of fixed hydraulic boarding axle!
一、根據(jù)登車橋尺寸,先挖好一個地坑,無地坑是無法安裝的;
1、 According to the dimensions of the boarding bridge, a pit shall be excavated first, and it cannot be installed without a pit;
二、把地坑內(nèi)走線的線路預(yù)留好,在地坑尾部的地方;
2、 Reserve the lines for wiring in the pit at the end of the pit;
三、地坑內(nèi)的三角邊都需要用鋼來包邊,把用于固定的錨釘焊接與角鋼的內(nèi)面,然后上面鋪一些沙子,再用混凝土鋪設(shè)一下;
3、 The triangular edges in the pit shall be wrapped with steel. The anchor nails used for fixing shall be welded to the inner surface of the angle steel, and then some sand shall be paved on it, and then concrete shall be paved;
四、將防撞膠塊固定于貨臺前端登車橋兩側(cè);
4、 Fix the anti-collision rubber block on both sides of the boarding bridge at the front end of the cargo platform;
五、檢查下各個部位是否固定牢固,施工完畢。
5、 Check whether the lower parts are firmly fixed and the construction is completed.
以上就是為大家介紹的有關(guān)移動登車橋的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://hblsnyfwzx.cn
The above is a detailed introduction to the mobile boarding bridge. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://hblsnyfwzx.cn
?